The work of installation of the escalator at Naigaon railway station platform number 1 has started. And soon a lift will be installed for the foot-over bridge on the Virar side (FOB) above platform number one. Also, the escalator and lift should be installed at platform no. 4 soon. A request has been made to Railway ADEN Shri Rajkumar Sharma in this regard and Mr. Sharma has assured us that the work will be started soon. Special thanks to Mr. Rajkumar Sharmaji
Team
Bahujan Vikas Aghadi
